Total investments 2013
$ 392.716.752
Own investments APAAP
| Fitting of the water well D6 and abduction pipe lote B | $ 254.912.191 |
|---|---|
| Accumulation pond 4.245 m3 | $ 7.306.900 |
| Gravity Water distribution network to all 80 estate | $ 130.497.661 |
| Total | $ 392.716.752 |




